Skip to content

StrucTime Gestion · Operations

The waste register keeps itself.

Each removal has its slip, and each slip feeds the register, which exports when you are asked for it.

01 · Construction waste

A slip, step by step.

The slip is filled in step by step: producer, carrier, treatment facility. The company number entered is checked.

  • Guided slip
  • Company number checked by its key
  • Carrier licence and treatment code

02 · Construction waste

The exportable register.

All slips form the waste register, filterable by type and status. It exports in one click.

  • Waste register
  • Filters by type and status
  • Register export

With the other modules

Waste follows the job.

The slip relates to the job that produces the waste.

  1. 1

    Job site

    Waste is produced on the job.

  2. 2

    Slip

    The removal has its slip.

  3. 3

    Treatment

    The facility and treatment code are recorded.

  4. 4

    Register

    The register exports.

Questions

What we are asked about construction waste.

Does the waste register export?

Yes, from the module.

Ready for an inspection.

In the demo we create a slip and export the register. Construction waste is included in the subscription.